Engineering Design of Bypass Line
PROJECT SUMMARY
A failed check valve was restricting flow, reducing plant output, so a bypass was required to regain the required flow rate. The plant had to remain online, so 2 hot taps were required before installation of the bypass line. The project was managed by the client with Five-D carrying out all the Mechanical Engineering, with specialist Hot Tap Fitter from the US and local Structural Engineer.
SCOPE
Our scope at Five-D was to carry out the engineering design of the bypass line to ASME B31.3. This involved:
3D modelling the area, based on 3D point cloud scan
Pipe stress analysis of existing, and final solution
Obtaining DV
Liasing with Structural Engineer to set up temporary supports
CHALLENGES
High temperatures resulting in large thermal movements of piping system
Very short installation window with Specialists coming from the US
Restricted space to locate HotTap drill equipment and bypass line.
OUTCOME
The project was a resounding success, with works completed on time and process flow restored to previous levels.