Engineering Design of Bypass Line
PROJECT SUMMARY
A failed check valve was restricting flow, reducing plant output, so a bypass was required to regain the required flow rate. The plant had to remain online, so 2 hot taps were required before installation of the bypass line. The project was managed by the client with Five-D carrying out all the Mechanical Engineering, with specialist Hot Tap Fitter from the US and local Structural Engineer.
SCOPE
Our scope at Five-D was to carry out the engineering design of the bypass line to ASME B31.3. This involved:
- 3D modelling the area, based on 3D point cloud scan 
- Pipe stress analysis of existing, and final solution 
- Obtaining DV 
- Liasing with Structural Engineer to set up temporary supports 
CHALLENGES
- High temperatures resulting in large thermal movements of piping system 
- Very short installation window with Specialists coming from the US 
- Restricted space to locate HotTap drill equipment and bypass line. 
OUTCOME
The project was a resounding success, with works completed on time and process flow restored to previous levels.
 
                        