Project Summary
admin2024-02-22T16:08:43+13:00
Vapour recovery unit off-skid engineering detailed design
Installation of a $2.5 Million dollar Vapour Recovery Unit at the Clients Storage and Road Loading Terminal.
admin2024-02-22T16:10:03+13:00
Pipeline Integrity Direct Assessments
Several pipeline integrity excavations and direct assessments are part of an ongoing pipeline integrity program.
admin2024-02-22T16:15:08+13:00
NGL storage tanks
Feasibility concept project to investigate the proposed installation of a new tank for safe storage and handling of Natural Gas Liquids (NGLs)
admin2024-02-22T16:15:46+13:00
HP Steam line hot tap and bypass project
Engineering design of bypass line to ASME B31.3