Project Summary
A failed check valve was restricting flow, reducing plant output, so a bypass was required to regain the required flow rate. The plant had to remain online, so 2 hot taps were required before installation of the bypass line. The project was managed by the client with Five-D carrying out all the Mechanical Engineering, with specialist Hot Tap Fitter from the US and local Structural Engineer.
Scope
Our scope at Five-D was to carry out the engineering design of the bypass line to ASME B31.3. This involved:
- 3D modelling the area, based on 3D point cloud scan
- Pipe stress analysis of existing, and final solution
- Obtaining DV
- Liasing with Structural Engineer to set up temporary supports
Challenges
- High temperatures resulting in large thermal movements of piping system
- Very short installation window with Specialists coming from the US
- Restricted space to locate HotTap drill equipment and bypass line.
Outcome
The project was a resounding success, with works completed on time and process flow restored to previous levels.